Kamloops Sandman Arena DSP and Amplifier upgrade  June 2020

Kamloops Sandman Arena DSP and Amplifier upgrade June 2020

  When Sound Solutions was contracted to replace the existing digital signal processors and speakers in June of 2020, we didn’t have access to the amplifier racks during our site survey, although they appeared to be in working condition. Once we commenced the...
Kamloops Sandman Arena Sound System Upgrade July 2020

Kamloops Sandman Arena Sound System Upgrade July 2020

What better time to do a sound system upgrade than when an arena is shut down due to Covid19? We had quoted the sound system upgrade of the Sandman Arena in 2019, after our successful installation of the Hillside Stadium sound system, and in April of 2020 were awarded...
Kamloops Hillside Stadium Sound installation –  November 2019

Kamloops Hillside Stadium Sound installation – November 2019

    Sound Solutions was awarded the installation of a new sound system at the Kamloops Hillside football stadium in June of 2019, after submitting a design in April of 2019 to replace the aging 13 year old distributed sound system. The original system had a...
Beban Park Arenas (Nanaimo)  – Sept 2019

Beban Park Arenas (Nanaimo) – Sept 2019

Sound Solutions was awarded the sound system installation contract of the Beban Park arenas by the City of Nanaimo in July of 2019. The system design was done by Sam Scott of www.Chroma.fm Consulting, and we installed the sound systems over a 2 week period during the...
Frank Crane & Cliff McNabb Arenas – May 2019

Frank Crane & Cliff McNabb Arenas – May 2019

In May of 2019 a tender came out for the upgrade of the Frank Crane and Cliff McNabb arenas in Nanaimo, BC. In July of 2019, Sound Solutions was awarded the contract to install both arena sound systems during the August annual shutdown of the arenas. The systems were...